Fujitsu M3000 Manual de usuario Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 76
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
Chapter 2 Preparing to Install the Server 2-7
FIGURE 2-2 Power Cables With a Dual-Power Feed Connection
2.2.2.3 Grounding
The SPARC Enterprise M3000 server is shipped with a grounded type (three-wire
type) power cable. Always connect the power cables to grounded power outlets.
Contact the facilities manager or a qualified electrician to determine what type of
power is supplied to your building.
2.2.3 Checking the Installation Location
When installing the server, consider not only the device size but also the sizes of the
required service areas (maintenance areas). For details, refer to the SPARC Enterprise
M3000 Server Site Planning Guide.
PSU#1 PSU#0
CB: Circuit breaker
CB
CB
AC power supply
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 75 76

Comentarios a estos manuales

Sin comentarios